// SM_0: get_to_know(andrew, thread_id) — 4 threads, 1 warp
// pipeline flush — switching execution context to datasheet mode
Datasheet
First-year human compute unit, ASIC/RTL specialization, GPU-curious
1. Features
2. Functional description
The AV-2029A is a first-year computer engineering unit at Purdue University, optimized for digital ASIC design with a growing focus on processor microarchitecture and GPU compute. The core pipeline already supports RTL design in SystemVerilog from specification through verification and synthesis, with an integrated RISC-V SoC as the flagship design. An on-chip verification subsystem drives pre-silicon validation through cocotb, Verilator, and the full LibreLane open-source EDA stack.
Currently ramping up a GPU hardware design track through Purdue SoCET, with long-term target of chip design at an ASIC company. When not at the EDA workstation, found either doomscrolling or bouldering.
3. Absolute maximum ratings Exceeding these may cause permanent damage
| Parameter | Symbol | Rating | Unit |
|---|---|---|---|
| Concurrent deadline pressure | P_DL | 4 | projects |
| Maximum sustained focus | T_FOCUS | 10 | hours |
| Supply voltage (caffeine) | V_CC | 100 | mg / day |
| Minimum sleep cycle | T_SLEEP | 5 | hours |
| Debug session endurance | T_DBG | 6 | hours continuous |
5. Auxiliary I/O Active peripheral interfaces
| Interface | Description | Status | Spec |
|---|---|---|---|
| CLIMB_IF | Bouldering — vertical problem-solving with no safety net | active | V6 |
| AUDIO_DAC | Audiophile subsystem — 7Hz Timeless · Moondrop Blessing 3 · FLAC · foobar2000 | active | IEM x2 |
| RUN_CLK | 5km training loop — chasing sub-20:00 timing closure | WIP | ~21:xx |
| CAFF_PLL | Power recovery — 20min nap or 100mg caffeine pill (Monster not in budget) | frequent | PRN |
| GACHA_EN | Gacha addiction bus — dopamine-locked to the pull animation | critical | $$$ |
| DEFER_EN | Procrastination engine — always enabled, no disable pin | stuck high | 1b |
6. Known errata Will be addressed in future silicon revisions
| ID | Description | Severity | Workaround |
|---|---|---|---|
| ERR001 | Trying to learn everything just to get burned out | critical | rest |
| ERR002 | DEFER_EN line stuck high — root cause unknown, persists across all silicon revisions | major | deadline |
| ERR003 | Not beating the “engineers don’t shower” allegations | major | soap |